OUR PROJECTS
ITER Project
ANO «Controlled Thermonuclear Fusion – International Projects» (CTF-Center), SKB of the Radio Engineering and Electronics Institute of the Russian Academy of Sciences, 2020 - 2022
Development of non-destructive testing methods, welding procedures, and certification of welding processes for fusion reactor safety control mechanisms.
Development of the Kirinsky gas and condensate field
LLC «SK-Severnaya Gavan», 2022
Welding technology certification, mechanical testing, development of regulatory documentation for non-destructive testing and UT (Ultrasonic Testing). Conducting validation tests of the Rotoscan Paulis PA 128 UT installation.
External transport gas pipeline from Novoportovskoye NGKM through the Ob Bay
Interregional Pipeline Construction Corporation, 2019
Conducting validation tests of the Rotoscan Paulis PA 128 ultrasonic testing equipment
Nord Stream 2
2020
Development of regulatory documentation for non-destructive testing of welded seams of the onshore section of the Nord Stream 2 pipeline. Conducting mechanical tests of the quality of welded joints.
JSC Transneft«
JSC Transneft, 2014«
Conducting in-situ (validation) tests of AUZK and MUZK units. Development of a Technological Instruction for AUZK of circumferential welded pipe joints at Transneft system facilities«
Power of Siberia
MS «Power of Siberia», 2015-2016
Technical requirements for welding and non-destructive testing of welded joints during construction, including at the crossing of active tectonic fault zones
South Stream
Coastal section of the «South Stream» gas pipeline near the city of Anapa, 2017
Conducting validation tests of the Rotoscan Paulis PA 128 ultrasonic testing equipment
Sakhalin-1
Sakhalin-1, 2004-2005
Development and qualification of welding procedures, development of welding work instructions
CTC
Caspian Pipeline Consortium (CPC), 1999-2000
Development of welding technologies, non-destructive testing, and supervision of welding work
BTS-1
Baltic Pipeline System (BTS-1), 2003-2004
Development of welding technologies, inspection, non-destructive testing, support of welding operations
VSTO-1, VSTO-2
East Siberia–Pacific Ocean (ESPO-1, ESPO-2) pipeline system, 2005-2010
Development of technologies and regulatory documents for welding, repair, and inspection. Support for welding operations.
BOVANENKOVO-UKHTA
Bovanenkovo-Ukhta Gas Pipeline, 2008-2013
Participation in the development of welding technologies, non-destructive testing, and work support.
Sakhalin-Khabarovsk-Vladivostok
Sakhalin-Khabarovsk-Vladivostok Gas Pipeline, 2009-2010
Participation in the development of welding technologies, non-destructive testing, and work support.
PORT CONTAINER TERMINAL«
2010-2011
Participation in the development of welding and non-destructive testing technologies
«KAZACHYA» Credit Cooperative»
2013-2014
Participation in the development and qualification of welding technologies, NDT; support of works
FILANOVSKOYE FIELD
Filyanovsky field onshore pipelines - Stavrolen, 2013-2014
Development of regulatory documents; qualification testing of welding procedures, support of welding works
New Kostroma
2015-2016
Development of production and technical documentation for welding and non-destructive testing of the quality of welded joints of drilling rig metal structures and piping of the circulation system and manifold riser.
UPGT «PORT» KS»
UPGT KS «Portovaya», 2010-2011
Participation in the development of welding technologies, non-destructive testing, and work support.
Development of the D33 field with infrastructure objects
Lukoil, PJSC «Mezhregiontruboprovodstroy», 2022
Conducting validation tests of the Rotoscan Paulis PA 128 ultrasonic testing equipment
Development of the V.I. Gryaifer field
Bumi Armada Caspian, 2021 – 2022
Development of regulatory documentation for ultrasonic testing of underwater pipeline welds, calculation of quality assessment criteria for welded joints. Conducting validation tests of the Rotoscan Paulis PA 128 ultrasonic testing equipment.
Bulgaria-Hungary border gas pipeline«
IDC Consortium, GasTrans LLC Novi Sad (Republic of Serbia), 2019
Development of regulatory documentation for non-destructive testing of welds on the «Bulgaria border - Hungary border» gas pipeline»
Gazprom PJSC Standards
Development of PAO Gazprom Standards, 2018 - 2022
PJSC Gazprom 15-1.1-002-2023
Nord Stream
Nord Stream project onshore pipelines, 2010-2011
Development and qualification testing of welding procedures, support for welding operations
GAZSTROYDETAL
Gazstroyretail JSC, 2015-2016
Development of an enterprise standard: «Technological instruction for welding and non-destructive testing in the manufacturing of fittings and assembly units for pipelines»
Yamal LNG
Yamal LNG, 2015-2016
Organization and execution of a set of works for qualification testing of welding technologies for the installation of inter-shop pipe racks
YAMAL – EUROPE
Yamal-Europe gas pipeline, 1996-1998
Development of welding technologies, non-destructive testing, and supervision of welding work
Blue Stream
Blue Stream gas pipeline, Russia-Turkey, 2000-2002
Participation in the development of welding, heat treatment, and inspection technologies for main gas pipelines and tie-in pipelines
North European
Nord Stream Pipeline, 2007-2009
Participation in the development of welding technologies, non-destructive testing, and work support.
BTS-2
Baltic Pipeline System (BTS-2), 2009-2010
Development of welding technologies and support of welding works
Kharyaginskoye field
Development of the Kharyaga field, 2009-2012
Development and qualification testing of welding procedures, support for welding operations
Sakhalin-1
Sakhalin-1. Arkutun-Dagi field development, 2010-2011
Development and qualification testing of welding procedures, support for welding works during the construction of offshore pipelines
UPGT KS «Kozachya»
2013-2015
Participation in the development and qualification of welding technologies, NDT; support of works
FILANOVSKOYE FIELD
Offshore pipeline section from the Filanovsky field, 2015-2016
Development of normative documents; qualification testing of welding procedures
MOSCOW REFINERY
2017-...
Project in progress. Conducting qualification tests during the installation of the «Euro+» combined oil refining unit at the Moscow Refinery, mechanical tests, consulting assistance
Astrakhan Gas Complex
Assembly of the Pentane-Hexane Fraction Isomerization Unit during the Reconstruction of the Astrakhan Gas Complex, 2012-2013
Development of welding technologies, non-destructive testing, and support for welding work
ITER Project
ANO «Controlled Thermonuclear Fusion – International Projects» (CTF-Center), SKB of the Radio Engineering and Electronics Institute of the Russian Academy of Sciences, 2020 - 2022
Development of non-destructive testing methods, welding procedures, and certification of welding processes for fusion reactor safety control mechanisms.
Development of the D33 field with infrastructure objects
Lukoil, PJSC «Mezhregiontruboprovodstroy», 2022
Conducting validation tests of the Rotoscan Paulis PA 128 ultrasonic testing equipment
Development of the Kirinsky gas and condensate field
LLC «SK-Severnaya Gavan», 2022
Welding technology certification, mechanical testing, development of regulatory documentation for non-destructive testing and UT (Ultrasonic Testing). Conducting validation tests of the Rotoscan Paulis PA 128 UT installation.
Development of the V.I. Gryaifer field
Bumi Armada Caspian, 2021 – 2022
Development of regulatory documentation for ultrasonic testing of underwater pipeline welds, calculation of quality assessment criteria for welded joints. Conducting validation tests of the Rotoscan Paulis PA 128 ultrasonic testing equipment.
External transport gas pipeline from Novoportovskoye NGKM through the Ob Bay
Interregional Pipeline Construction Corporation, 2019
Conducting validation tests of the Rotoscan Paulis PA 128 ultrasonic testing equipment
Bulgaria-Hungary border gas pipeline«
IDC Consortium, GasTrans LLC Novi Sad (Republic of Serbia), 2019
Development of regulatory documentation for non-destructive testing of welds on the «Bulgaria border - Hungary border» gas pipeline»
Nord Stream 2
2020
Development of regulatory documentation for non-destructive testing of welded seams of the onshore section of the Nord Stream 2 pipeline. Conducting mechanical tests of the quality of welded joints.
Gazprom PJSC Standards
Development of PAO Gazprom Standards, 2018 - 2022
PJSC Gazprom 15-1.1-002-2023
JSC Transneft«
JSC Transneft, 2014«
Conducting in-situ (validation) tests of AUZK and MUZK units. Development of a Technological Instruction for AUZK of circumferential welded pipe joints at Transneft system facilities«
Nord Stream
Nord Stream project onshore pipelines, 2010-2011
Development and qualification testing of welding procedures, support for welding operations
Power of Siberia
MS «Power of Siberia», 2015-2016
Technical requirements for welding and non-destructive testing of welded joints during construction, including at the crossing of active tectonic fault zones
GAZSTROYDETAL
Gazstroyretail JSC, 2015-2016
Development of an enterprise standard: «Technological instruction for welding and non-destructive testing in the manufacturing of fittings and assembly units for pipelines»
South Stream
Coastal section of the «South Stream» gas pipeline near the city of Anapa, 2017
Conducting validation tests of the Rotoscan Paulis PA 128 ultrasonic testing equipment
Yamal LNG
Yamal LNG, 2015-2016
Organization and execution of a set of works for qualification testing of welding technologies for the installation of inter-shop pipe racks
Sakhalin-1
Sakhalin-1, 2004-2005
Development and qualification of welding procedures, development of welding work instructions
YAMAL – EUROPE
Yamal-Europe gas pipeline, 1996-1998
Development of welding technologies, non-destructive testing, and supervision of welding work
CTC
Caspian Pipeline Consortium (CPC), 1999-2000
Development of welding technologies, non-destructive testing, and supervision of welding work
Blue Stream
Blue Stream gas pipeline, Russia-Turkey, 2000-2002
Participation in the development of welding, heat treatment, and inspection technologies for main gas pipelines and tie-in pipelines
BTS-1
Baltic Pipeline System (BTS-1), 2003-2004
Development of welding technologies, inspection, non-destructive testing, support of welding operations
North European
Nord Stream Pipeline, 2007-2009
Participation in the development of welding technologies, non-destructive testing, and work support.
VSTO-1, VSTO-2
East Siberia–Pacific Ocean (ESPO-1, ESPO-2) pipeline system, 2005-2010
Development of technologies and regulatory documents for welding, repair, and inspection. Support for welding operations.
BOVANENKOVO-UKHTA
Bovanenkovo-Ukhta Gas Pipeline, 2008-2013
Participation in the development of welding technologies, non-destructive testing, and work support.
BTS-2
Baltic Pipeline System (BTS-2), 2009-2010
Development of welding technologies and support of welding works
Sakhalin-Khabarovsk-Vladivostok
Sakhalin-Khabarovsk-Vladivostok Gas Pipeline, 2009-2010
Participation in the development of welding technologies, non-destructive testing, and work support.
Kharyaginskoye field
Development of the Kharyaga field, 2009-2012
Development and qualification testing of welding procedures, support for welding operations
PORT CONTAINER TERMINAL«
2010-2011
Participation in the development of welding and non-destructive testing technologies
Sakhalin-1
Sakhalin-1. Arkutun-Dagi field development, 2010-2011
Development and qualification testing of welding procedures, support for welding works during the construction of offshore pipelines
«KAZACHYA» Credit Cooperative»
2013-2014
Participation in the development and qualification of welding technologies, NDT; support of works
UPGT KS «Kozachya»
2013-2015
Participation in the development and qualification of welding technologies, NDT; support of works
FILANOVSKOYE FIELD
Filyanovsky field onshore pipelines - Stavrolen, 2013-2014
Development of regulatory documents; qualification testing of welding procedures, support of welding works
FILANOVSKOYE FIELD
Offshore pipeline section from the Filanovsky field, 2015-2016
Development of normative documents; qualification testing of welding procedures
New Kostroma
2015-2016
Development of production and technical documentation for welding and non-destructive testing of the quality of welded joints of drilling rig metal structures and piping of the circulation system and manifold riser.
MOSCOW REFINERY
2017-...
Project in progress. Conducting qualification tests during the installation of the «Euro+» combined oil refining unit at the Moscow Refinery, mechanical tests, consulting assistance
UPGT «PORT» KS»
UPGT KS «Portovaya», 2010-2011
Participation in the development of welding technologies, non-destructive testing, and work support.
Astrakhan Gas Complex
Assembly of the Pentane-Hexane Fraction Isomerization Unit during the Reconstruction of the Astrakhan Gas Complex, 2012-2013
Development of welding technologies, non-destructive testing, and support for welding work